Loanranger
Member
- Joined
- Aug 6, 2007
- Messages
- 842
- Reaction score
- 4
- Points
- 18
- Age
- 43
- Location
- Puyallup, Wa
- Vehicle Year
-
1989/
1972
- Make / Model
-
Ford/
Fordzuki
- Engine Size
- 2.9/2.3
- Transmission
- Manual
Ok, on to some updates.
I got two more pieces made and installed on the passenger side. This leaves, I hope, just one more piece to cover the last hole. I also got the gas pedal mounted finally, and the throttle cable hooked up too. Because of the 1/8th inch firewall, I had to shave about an 1/16th off of the tabs that hold it into the firewall, but it snapped right in and holds tight.
Got the firewall primed...
And seamsealed...
And painted.
I got the PCM installed, I just put a nut on the back of the stock studs, I also installed a ground stud near the PCM for the ground there. I will have to install one more ground stud for the rest of the grounds in the underhood harness.
I cleaned up the front clip a little and gave it a paintjob too.(Well, the inside anyways)
So we're down to:
Fuel
wrap and install wiring
finish passenger side tunnel and top
prime, seamseal, and paint interior
Wire ignition, tach, fuel pump, fan and lights
reinstall seats
build intake/filter system
shorten trans shifter
more tomorrow.
I got two more pieces made and installed on the passenger side. This leaves, I hope, just one more piece to cover the last hole. I also got the gas pedal mounted finally, and the throttle cable hooked up too. Because of the 1/8th inch firewall, I had to shave about an 1/16th off of the tabs that hold it into the firewall, but it snapped right in and holds tight.
Got the firewall primed...
And seamsealed...
And painted.
I got the PCM installed, I just put a nut on the back of the stock studs, I also installed a ground stud near the PCM for the ground there. I will have to install one more ground stud for the rest of the grounds in the underhood harness.
I cleaned up the front clip a little and gave it a paintjob too.(Well, the inside anyways)
So we're down to:
Fuel
wrap and install wiring
finish passenger side tunnel and top
prime, seamseal, and paint interior
Wire ignition, tach, fuel pump, fan and lights
reinstall seats
build intake/filter system
shorten trans shifter
more tomorrow.