Hurry up...you're slow. Just kidding man, truck is looking good! when are you moving?
Yeah I was hoping to get a lot done this week while I am off but companies apparently like to take breaks over this time and slack on shipping stuff out. I am probably not going to be able to do much until the end of Feb now. I should get my sliders done this month though.
Oh and I am moving in April. The tube bed WILL be done before then. By the way, I know a Moab trip fell on its face for 2012, but we seriously should try and do a Moab/Utah trip in September. I am thinking labor day weekend. Get you and Hahn to drive down and whoever wants to wheel/camp/road trip through the all the NP down there.
Today I cut a hole on the backside of the crossmember for wiring. I also welded on a receiver hitch. I still want to add a couple more gussets on the back side, but I am happy with it.
My welding is improving, here is my prettyish weld. Feel free to critique.
And here is some the parts I am collecting. Jaz 22 gal cell, summit fuel filler kit, holley in-line fuel pump, jegs pre pump filter, various fittings and barbs, and some fuel line. The plan is to mount the cell over/ behind the rear frame rails and have it sit flush with them. It should not raise above the flat deck much, mostly the filler spout.