- Joined
- Jul 10, 2008
- Messages
- 1,439
- Points
- 3,101
- Age
- 39
- City
- Akron Ohio
- Vehicle Year
- 90
- Engine
- Transmission
- Manual
- Total Lift
- 6"
- Tire Size
- 44
New Steering
Finally got to my steering.
Pulled my $15 junk yard setup off that I have been running for 2 years. That is one of the main reasons I could not go faster than 40 mph without a death shake. The TREs were shot on that setup. It was only supposed to be temporary
Old Setup
I quickly found out that the OEM panhard / track bar was not going to work with the new setup. I had about 1/8" of clearance lock to lock with the old setup. The new tube is 1.5 x .250 wall where the old stuff was 1" dia. So I had to make a new track bar too. So i measured my tube. They gave me an extra foot! Therefore, I was able to make a new track bar too.
First step was to drill out the knuckles to 3/4".
Cross bar and track bar.
I will need to modify the engine cross member a bit.
How it sits. Still need to enlarge a few holes for the drag bar. They are 1/2 right now. They will be 5/8". Everything also needs to be finish welded.
Full right turn
I might brace the pitman arm. I also wish I made the drag link the same length as the track bar. I ran out of tube haha. We will see how it works.
Finally got to my steering.
Pulled my $15 junk yard setup off that I have been running for 2 years. That is one of the main reasons I could not go faster than 40 mph without a death shake. The TREs were shot on that setup. It was only supposed to be temporary

Old Setup


I quickly found out that the OEM panhard / track bar was not going to work with the new setup. I had about 1/8" of clearance lock to lock with the old setup. The new tube is 1.5 x .250 wall where the old stuff was 1" dia. So I had to make a new track bar too. So i measured my tube. They gave me an extra foot! Therefore, I was able to make a new track bar too.

First step was to drill out the knuckles to 3/4".



Cross bar and track bar.
I will need to modify the engine cross member a bit.


How it sits. Still need to enlarge a few holes for the drag bar. They are 1/2 right now. They will be 5/8". Everything also needs to be finish welded.


Full right turn

I might brace the pitman arm. I also wish I made the drag link the same length as the track bar. I ran out of tube haha. We will see how it works.
Last edited: