A nice warm couple of days and I was hitting it pretty hard
.
The dog figured the foucus was on the Ranger so he figured it was going somewhere and he was riding in it wherever it was headed to
Back down to the frame again to start building the link suspension and box and plug the frame.
Found a crack in the transfer case this thing looks like it slid down the road.
Day one done everything put up and the garage is plum packed full
Day 2 weld the holes up and make pieces up to box the chassis in
using a copper bus bar to back the metal hole
Template for the first portion of boxing it works on both sides
Traced out the template and cut out 2 pieces with a .045 wheel on a 4-1/2" grinder.
That was my stopping point for the day.
The engine cross member is gonna get a major overhaul once I get the boxing done engough I can put the motor back in and figure out what kind of clearance the cab has to it.