ok,two months today.
i could do a little retrospective here,but the past isn't where the progress is.anyone wanting to see that knows how to go through the pages.
as stated a few posts back,the next big step is to make it run.i need to build the left side header,as well as complete the right side header.
the brake pedal has to be hung,and lines run to the calipers.
throttle linkages must be made.
i nicked the trans pan with the sawzall while trimming the frame,so that needs to be pulled and welded.this means pulling the engine out of the frame.
basic fuel and electrical systems need to be set up.
a driveshaft needs to be built and installed.
i think this covers the main job list for the next little while.if i've forgotten something,i'll remember it as it comes up.