nb11
Well-Known Member
I have a 2003 ranger, 2wd, with coil overs on the front, and I'm wanting to put some coil spacers in to level it a bit. I'm thinking maybe 1.5-2 inches of lift. How much is too much before I need to make changes to fix the amount of camber? And how much does an allignment job usually cost? Thanks!