axles are still sitting in my garage, as they have been for the past year, but heres what i have into so far:
1979 fullwidth dana 44 and 9inch:free

2002 2wd ext cab f150 rear leafs:free
1994 cherokee gas tank:free
2.63" ballistic joint(x2) 107.98
spanner socket for joints 35.99
1.5" 14tpi jam nut(x2) 13.98
shock tabs(x2) 1.98
coil spring retainer(x2) 17.98
adj. coil buckets 71.99
frame link mount(x2) 45.98
2"o.dx.250 wallx48"DOM(x2) 136.88
31slpine spool for 9inch 159.00
1310 yoke for 9inch 68.50
9inch 5.13's 205.00
9inch master overhaul 139.00
9inch ubolts 35.00
dana 44 3.73&up carrier 85.00
dana 44 5.13's 119.00
dana 44 overhaul 85.00
dana 44 lockrite 125.00
760x u joints 50.00
7 degree bushings 48.00
warn premium hubs 95.00
gear setup 200.00
very used38.5x16x15 mt baja
bias & steel wheels 300.00
misc. kragen & napa receipts 250.00+/-
saginaw steering pump 65.00
-------------------------
still need:
ballistic fab 3/4 hm steering 286.99
trail gear shock hoops or f250 shock mounts?
broncograveyard.com 5.5"superflex coils 140.00
braided ss brakelines 150.00
bilstien 5150's.....which valving? 450.00
37x12.50x15 pitbull rocker radials
yukon hardcore chromo
yukon or 300m u joints
superior alloy shafts for 9inch
-------------------------
so far i have 2461.26 invested into the swap alone, and probably another 1100 until its driveable, then another 2500 until i think i can call it done

.........that is until i pull the trigger on a 14bff and hp d60
