AngryLepercon
New Member
- Joined
- Sep 1, 2008
- Messages
- 2,150
- Reaction score
- 39
- Points
- 0
- Location
- Maryland
- Vehicle Year
- 1999
- Make / Model
- Ford
- Engine Size
- 4.0
- Transmission
- Automatic
So today after a long day of rodding and stringing in the city manholes we get a call from the owner saying we are not getting our checks until Tuesday because the funds are not there. We were contracted out to run a 24-way of 4 inch pipe about 1000 feet. Top 16 of the 24 way turned off and bottom 8 stayed straight. (according to the blueprints) We followed the prints and everyone approved the prints before they were handed to us. Everything was installed and concreted. We left the jobsite because we fulfilled the contract. The fiber lines were run and everything was done. BUT they are saying we did it wrong and the top 8 were to stay straight and the bottom 16 to turn off. (not according to the prints) The company we did this work for is not paying us for the work done because they are claiming it is wrong from what they wanted but perfect to the prints. Is there anything we can do or is it just word against word?