Front is done minus the shock towers and brake lines. Along with making sway bar links to suit.
I am going to switch gears and go at the rear now.
I have to pick up the 8.8 this week and go pull leafs from donor chev. Rear will go fast have done it before and have parts somewhere for the hangers. Guy with the 8.8 has a one piece drive shaft too so can get that in while I'm at it.
I'll do the shocks when I have the rear done so I can order all at once. Hoping that it will all be done before may giving me a month and a bit to finish stuff up. Because of all the changes I've done I got to sort thru the ripple effect and get the exhaust routed happily around the third link and hung happily.
I'm still not happy with the battery location in the box thought about maybe putting it behind the drivers seat but not totally set on that either maybe will just leave it where it is and build a aluminum cover or something.